My World Earth News Headline Animator

My World Earth News
Showing posts with label oil spill. Show all posts
Showing posts with label oil spill. Show all posts

Tuesday, September 21, 2010

BP permanently ‘kills’ Gulf of Mexico well


With a final shot of cement, BP Plc permanently “killed” the runaway Macondo well in the Gulf of Mexico that had unleashed the worst oil spill in US history, the top US spill official said today.

The well flowed unchecked for 87 days after an April 20 explosion aboard the Deepwater Horizon rig killed 11 workers and unleashed a torrent of oil that marred the coasts of four Gulf Coast states and spurred a moratorium on all new US offshore drilling.





BP engineers sealed off the flow on July 15 with a cap on the mile-deep well after it spewed more than 4 million barrels into the Gulf, about 16 times as much as the 257,000 barrels of oil spilled by the Exxon Valdez disaster in Alaska in 1989.

The spill wiped about US$70 billion (RM217 billion) from BP’s market value and spurred BP to replace its gaffe-prone chief executive Tony Hayward with an American, Bob Dudley, effective October 1.


Beast Stalker
U2 Home Entertainment, Inc.
Chok Dee
Shamo 468 x 60
U2 Home Entertainment, Inc.

Thursday, September 16, 2010

BP cited for North Sea safety lapses as outgoing boss Tony Hayward faces grilling by MPs

BP's operations in the North Sea were investigated six months before the Gulf of Mexico explosion amid questions about staff safety training, it emerged today.

The Health and Safety Executive found new staff were not being trained to 'basic safety standards', according to a letter obtained under Freedom of Information laws.

Inspectors found several of the oil giant's installations in the North Sea had broken emergency rules for training staff on how to respond to spills.

Outgoing BP chief Tony Hayward is sure to be asked about the inadequate training when he appears before a Commons select committee today.

Photobucket
Safety lapses: Inspectors found BP was not training staff on its North Sea rigs properly six months before the Deepwater Horizon explosion



In his first appearance in the UK since the Deepwater Horizon disaster, Mr Hayward will face the Energy and Climate Change Committee.

It is is investigating the implications of the U.S. oil spill for offshore drilling in the UK and looking at whether the UK regime is fit for purpose.

The HSE launched an inquiry after a worker on the Clair Rig near the Shetland Islands complained, according to The Telegraph who put in the FoI request.

Executives were told in October 2009 that 'training of some new personnel to basic safety standards was ineffective'.

The letter also said there was 'evidence of a culture among your contractors, Seawell (up to senior levels of management), of working outside of procedures, permit or permit conditions'.

BP was also criticised for failing to take the complaint seriously. Investigators said it 'did not appear to identify the significance of issues raised by the complainant once they were put to you by HSE'.

The letter reportedly says there were four different examples on North Sea rigs from 2008 to 2009 when the oil giant had not learned lessons following investigations.

A BP spokesman told the paper: 'Clair has an excellent safety track record and has recently achieved six years of operation without any injury that has resulted in a day away from work.'

Other documents obtained by the Financial Times reveal how all but one of BP's North Sea rigs inspected in 2009 were reprimanded for a lack of training.

The Department of Energy and Climate Change (DECC) inspectors also found the firm had not conducted oil spill exercises properly at some of its offshore sites.

Months later, BP's Deepwater Horizon rig off the coast of the U.S. exploded - killing 11 workers and sparking one of the biggest environmental catastrophes in U.S. history.

The firm has 33 platforms in the North Sea, of which 12 were inspected by DECC officials in the five years to the end of 2009.

Records show 11 of the 23 inspections led to criticism of its training methods, according to the Financial Times. Eight inspection reports on seven different rigs suggested necessary training had not happened.

A BP spokesman said: 'DECC raised a valid issue with us regarding oil spill response training and the frequency of training exercises.

'The small number of personnel who had not undergone refresher training have now been brought up to date and we are fully compliant with this part of the regulations.

'Regarding oil spill exercises, we regularly test our oil spill response plans, involving teams onshore and offshore.

'The DECC points related to the required frequency of offshore oil spill response exercises and to the particular way in which DECC required us to record those exercises.

'These points have now been clarified and we are fully compliant with the regulations.'

Photobucket
Tony Hayward will be grilled by the Energy and Climate Change Committee





Wednesday, September 8, 2010

BP report shifts blame for Gulf of Mexico oil spill to American contractors-'There was a bad cement job':

BP triggered a further backlash last night as it tried to shift the blame for the Gulf of Mexico oil disaster.

In a report released yesterday into the cause of the spill, the beleaguered British oil giant claims two other multinational companies were largely at fault.

The 193-page internal investigation plays down BP's culpability for America's worst ever oil leak, which took 87 days to plug and strained relations between the U.S. and Britain.


* BP highlights roles of Transocean and Halliburton
* 'Shoddy' cement caused gas & oil to enter well
* Oil rig workers took 40minutes to realise fault
* Explosion caused 5m barrels of oil to leak into Gulf
Photobucket
Findings: BP has admitted failures among its staff which led to the Deepwater Horizon oil spill
Photobucket
The Macondo well in the Gulf of Mexico. A blow-out caused the biggest ever off-shore oil spill



But it provoked an angry response last night from U.S. politicians, environmentalists and the firms it singled out for blame.

BP insisted that a 'sequence of failures involving a number of different parties' led to the April 20 rig explosion that killed 11 rig workers and spilled almost five million barrels of oil into the ocean.

According to the four-month probe, 'multiple companies and work teams' contributed to the accident. BP denied the design of its deepwater well triggered the catastrophe.

Distancing itself further from blame, BP castigated Transocean, the U.S. owners of the rig, for failing to prevent the blast and U.S. contractors Halliburton for a botched cement job that allowed highly explosive natural gas, or hydrocarbons, to seep into the well.

Investigators also claimed the blowout preventer – a key piece of safety equipment operated by Transocean – should have sealed off the well immediately after the explosion.

'To put it simply, there was a bad cement job and a failure of the ... barrier at the bottom of the well,' BPs departing chief executive Tony Hayward said last night.

'It would appear unlikely that the well design contributed to the incident.'

However, critics said BP drew its conclusions without examining the broken blowout preventer, which was only hauled to the surface last week and is currently being probed by government experts.

The report brought a sharp rebuke from U.S. Congressman Edward Markey, a member of the investigating political committee.

'This report is not BP's mea culpa,' he said last night. 'Of their own key findings, they only explicitly take responsibility for half of one.BP is happy to slice up blame, as long as they get the smallest piece.'

Environmental groups in the U.S. claimed BP was 'bending over backwards' to avoid the blame to combat multi-billion pound lawsuits and possible charges of criminal negligence.

Transocean also hit back at the report, drawn up by BP safety chief Mark Bly and team of 50 employees.

This is a self-serving report that attempts to conceal the critical factor that set the stage for the incident: BP's fatally flawed well design,' the company said in a statement.

'In both its design and construction, BP made a series of cost-saving decisions that increased risk – in some cases, severely.'

Halliburton said it had carried out its work at the well 'in accordance with BP's specifications' and that the report contained 'a number of substantial omissions and inaccuracies'.

The report is far from the last word in determining culpability.

The U.S. Coast Guard and Department of Justice are carrying out their own inquiries, which could result in criminal charges.


Blame game: Outgoing BP CEO Tony Hayward supervises recovery operations in the Gulf of Mexico in may


Photobucket

Thursday, September 2, 2010

U.S. offshore oil fire may delay lift of drill ban



The Obama Administration is likely to stay focused on toughening regulatory oversight of the U.S. offshore oil industry and may push back lifting a ban on deepwater drilling after the latest accident in the Gulf of Mexico, analysts said on Thursday.

Boats spray water to extinguish a fire on an oil and gas platform operated by Mariner Energy off the Louisiana coast September 2, 2010





The fire on a Mariner Energy oil and gas platform in shallow waters of the U.S. Gulf on Thursday was a major setback for companies hoping for an early end to the government's drilling moratorium and raised more questions about the safety of offshore drilling.

"This explosion will make it less likely that the moratorium on offshore drilling will be lifted," said Rick Muller, senior analyst for Energy Security Analysis Inc in Boston.

The United States is still reeling from the BP oil spill in the Gulf of Mexico.

Interior Department officials declined to comment on whether the Mariner accident would prompt Interior Secretary Ken Salazar to consider expanding the current deepwater drilling moratorium to shallow waters.

Such a action would be a blow to the oil industry, which has complained that the department has been too slow to approve permits for shallow water drilling since the Gulf oil spill.

The Interior Department imposed a six-month halt on exploratory deepwater drilling in late May after an explosion on April 20 left a well spewing crude into the Gulf.

The oil industry and regional lawmakers slammed the drilling ban and said it would drive idled rigs to foreign waters, cost thousands of jobs, and cut regional production.

On Wednesday, a federal judge ruled against the government's request to throw out an industry lawsuit challenging the moratorium, though this accident could strengthen the government's case, analysts said.

"This will help the government argue in court that it should be careful about putting safety rules in place before letting producers get back to drilling," Muller said.

The Interior Department had said it was considering lifting the ban for "certain categories" of rigs before November 30, when the ban is due to end. But after Thursday's accident the department may hesitate to do so, analysts said.

"Anything that casts any kind of shadow on the industry right now certainly complicates lifting the moratorium," said Bruce Bullock, director of the Maguire Energy Institute at Southern Methodist University in Texas.

President Barack Obama, whose administration was accused of being slow to act on the BP spill, has insisted a "pause" on drilling was needed to give the government time to impose tougher oversight on the industry.

"Any headline of a rig explosion so close on the heels of the deepwater explosion will have psychological effects," said Peter Beutel, president of Cameron Hanover in New Canaan, Connecticut.

"The fire will give fresh ammunition to those supporting a moratorium against offshore drilling to suggest that running rigs in the middle of the ocean is dangerous," Beutel said.

SAFETY A BIG CONCERN

U.S. Representative Edward Markey, a Democrat from Massachusetts, said in a statement the accident "highlights the significant risks associated with offshore drilling, and that much is left to be done to keep America's workers and waters safe from those risks."

Environmental groups criticized offshore oil and gas operators after Thursday's accident.

"We know that this kind of disaster is a result of a dirty and dangerous industry that cuts corners on safety, and takes too many risks in the effort to find more oil and make bigger and bigger profits," Greenpeace USA Oceans Campaign director John Hocevar said in a statement.

Kieran Suckling, executive director of the Center for Biological Diversity, called on the government to put all offshore oil and gas operations on hold until it can be determined they are safe.

"Offshore drilling in the Gulf of Mexico is like playing Russian roulette. It's not a matter of if something will go wrong, it's a matter of when," Suckling said.





13 oil workers pulled from sea after second offshore rig explodes in Gulf of Mexico





An offshore petroleum platform has exploded in the Gulf of Mexico, west of the site of the April blast that caused the massive oil spill.

U.S. Coast Guard officers received reports of the explosion at the rig which produces 1,400 barrels of oil a day from a commercial helicopter company at about 2.30pm today.

Seven helicopters, two aeroplanes and four boats were sent to the site, about 100 miles south of Vermilion Bay off the central Louisiana coast.


Photobucket
Flashback: The explosion at the Deepwater Horizon rig in April killed 11 workers and saw 206 million gallons of oil spill into the Gulf
Photobucket
Escape: The 13 workers are pictured shortly before they were rescued after evacuating the burning oil rig





All 13 people aboard the rig were rescued from the sea after evacuating as the fire took hold.

One of the crew members was injured, but the extent was not known.

They were rescued from the water by an offshore service vessel, the Crystal Clear, and then taken to a nearby platform.

All were flown to the Terrebonne General Medical Center in Houma to be checked over.

The men told the rescuers that all wells were closed before they evacuated their rig.

The blaze was later extinguished by three ships with fire fighting capabilities.

'Thirteen people were seen huddled together in the water wearing gumby suits or immersion suits, water protection suits, so we were able to confirm that all people were accounted for,' Coast Guard spokesman Chief Petty Officer John Edwards said.

'These guys had the presence of mind, used their training to get into those gumby suits before they entered the water. It speaks volumes to safety training and the importance of it because, beyond getting off the rig, there's all the hazards of the water such as hypothermia.'

Seven Coast Guard helicopters, two aeroplanes and three cutters were dispatched to the scene from New Orleans, Houston and Mobile, Alabama.

The platform, known as Vermilion Oil Platform 380, was owned by Mariner Energy of Houston.

It stands in just 340ft of water and produces 900,000 cubic litres of natural gas each day.

The Coast Guard tonight backtracked on its earlier report that an oil sheen about a mile long was spreading following a platform explosion in the Gulf of Mexico.

Coast Guard Commander Cheri Ben-Iesau said crews were unable to confirm the oil sheen a mile long and 100ft wide initially reported by platform owner Mariner Energy.

White House press secretary Robert Gibbs said President Barack Obama was in a national security meeting and did not know whether Obama had been informed of the explosion.

'We obviously have response assets ready for deployment should we receive reports of pollution in the water,' Gibbs said.

Mariner Energy focuses on oil and gas exploration and production in the Gulf of Mexico.

In April, Apache Corp., another independent petroleum company, announced plans to buy Mariner in a cash-and-stock deal valued at $3.9 billion, including the assumption of about $1.2 billion of Mariner's debt.

The deal is still pending, while a company report said the well was drilled in the third quarter of 2008.

Federal authorities have cited Mariner Energy and related entities for ten accidents in the Gulf of Mexico over the last four years, according to safety records from the Bureau of Ocean Energy Management, Regulation and Enforcement.

The accidents range from platform fires to pollution spills and a blowout, according to accident-investigation reports from the agency formerly known as the Minerals Management Service.

Around 206 million gallons of oil from an undersea well spilled into the Gulf after BP's Deepwater Horizon rig exploded on April 20, killing 11 workers.
Photobucket
Map locates site of new oil rig explosion
Photobucket
On fire: The burning oil rig is sited 100 miles of the coast of Louisiana, US. 13 crew members were rescued by Coast Guard boats sent to the scene after an explosion and other vessels then tackled the blaze
Photobucket
Rescued: Two workers, left, stand by a US Coast Guard helicopter after they were flown to Terrebonne General Medical Center in Houma, Lousiana for a check-up
Photobucket
Dangerous: The oil rig fire is pictured from a rescue helicopter before ships arrived
Photobucket
Safety measures: Boats continue to spray water on the platform after extinguishing the fire
Photobucket

Extinguished: Three fire fighting ships dampen the oil rig down after the blaze which forced the 13 crew members to evacuate into the sea






Monday, August 30, 2010

Obama vows to finish US Gulf Coast recovery


US President Barack Obama pledged yesterday to finish restoring the Gulf Coast area hit by Hurricane Katrina, five years after the storm ravaged the region and hurt the credibility of his Republican predecessor.

Obama visited New Orleans — the city hardest hit by the disaster — with his family at the end of a week-and-a-half vacation on the island of Martha’s Vineyard in Massachusetts.

During the 2008 presidential election, Democrat Obama sharply criticised then-President George W. Bush for his administration’s slow response to the flooding and devastation that played out live on television.

People burn incense during a ceremony to mark the fifth anniversary of Hurricane Katrina in New Orleans, Louisiana, August 29, 2010





Ahead of November’s congressional elections, Obama used his speech to highlight his administration’s action since taking office, drawing an implicit contrast without naming Republicans or Bush by name.

“It was a natural disaster, but also a man-made catastrophe, a shameful breakdown in government that left countless men and women and children abandoned and alone,” Obama said in a speech at Xavier University.

On the most recent calamity to hit the region, the oil spill in the Gulf of Mexico, Obama promised to reverse the damage it caused and hold energy giant BP accountable.

In an interview with NBC News, Obama rejected any comparisons between his administration’s response to the spill and the Bush administration’s response to Hurricane Katrina.

“It’s just not accurate,” Obama said. “If you look we had — immediately thousands of vessels. Tens of thousands of people who are here.”

“We have a lot more work to do,” he said. But Obama said that because of a swift response, “there’s a lot less oil hitting these shores and these beaches than anybody would have anticipated given the volume that was coming out of the BP oil well.”

Hurricane Katrina, which hit in 2005, killed more than 1,800 people and caused billions of dollars of damage to the Gulf coast.

Obama noted that his director of the Federal Emergency Management Agency, Craig Fugate, had 25 years of experience in disaster management — a marked contrast with Michael Brown, whose performance as Fema director when Katrina hit was widely criticized and immortalized, infamously, by Bush’s comment: “Brownie, you’re doing a heck of a job.”

Democrats are expected to lose a significant number of seats and possibly majorities in both houses of Congress in November. The White House has sought to boost Democrats’ chances by highlighting mistakes from the Bush years.

Obama said, “I don’t have to tell you that there are still too many vacant and overgrown lots. There are still too many students attending classes in trailers. There are still too many people unable to find work. And there are still too many New Orleanians ... who haven’t been able to come home.

“So while an incredible amount of progress has been made, on this fifth anniversary, I wanted to come here and tell the people of this city directly: my administration is going to stand with you, and fight alongside you, until the job is done,” he said to applause.



Sunday, August 15, 2010

Obama visit Gulf of Mexico , the job is not done yet.Obama speak about BP oil disaster recovery.










Obama, daughter swim in Gulf in act of reassurance



Photobucket
US President Barack Obama (L), First Lady Michelle Obama (R) and their daughter Sasha

US President Barack Obama and his daughter have taken a dip in the Gulf of Mexico in an attempt to reassure Americans that, despite a massive oil spill, its waters remain safe for tourists.

The president, First Lady Michelle Obama, and their younger daughter, Sasha, traveled to this Florida panhandle city to talk to local officials and business leaders, and highlight the region's tourist attractions.

"Oil is no longer flowing into the Gulf," said Obama, speaking at a regional US Coast Guard headquarters.

"But I'm here to tell you that our job is not finished, and we are not going anywhere until it is."







Photobucket
First Lady Michelle Obama putts during a round of mini golf in Panama City Beach, Florida


Obama said that he wanted to deliver the message directly to residents of the Gulf Coast, which he has visited four times since an April explosion on a BP-leased oil rig triggered the disaster.

"I made a commitment in my visits here that I was going to stand with you... until you have fully recovered from the damage that has been done. And that is a commitment my administration is going to keep," he said.

And Obama also demanded that BP speed up processing of compensation claims, saying that "any delays -- by BP or by those managing the new fund -- are unacceptable."

Earlier this week BP made its first deposit into the 20-billion-dollar Gulf of Mexico oil disaster fund intended to compensate thousands of residents and businesses hit by the largest maritime oil spill of all time.

During the height of the spill Obama urged his fellow Americans to continue taking vacations in the region, famous for its sugar-white beaches, and heavily dependent on tourism.

Obama later went for a swim with Sasha at Panama City Beach, away from the public and press cameras, with only an official photo of the pair -- heads bobbing just above the water line -- issued by the White House.

While the image might go far to reassure Americans that Gulf waters are safe, Obama had stressed he would take a presidential plunge in private.

The last time Obama, who is physically fit, was photographed swimming without a shirt was in December 2008, shortly before he took office. The pictures were broadly circulated and used on the cover of news magazines.

When a reporter covering the Obamas' Florida vacation joked that this publicity was a good thing, Michelle Obama shook her head and said, "No, it's not."

The president and his family are scheduled to return to Washington on Sunday.

The trip comes after US officials announced that energy giant BP's runaway well had been sealed, and that they were moving ahead with plans to make sure it is truly "killed" by pumping cement in through a relief well under the Gulf of Mexico.

Pressure tests showed that the well no longer has "direct communication with the reservoir" thanks to a "top kill" operation which pumped drilling mud and cement down through the wellhead, US spill chief Thad Allen said.

Allen on Saturday issued a directive for BP to run a new series of tests and provide plans to ensure the safety of the "bottom kill" operation, before he gives the green light for a relief well to resume drilling.

The relief well, which is approximately 100 feet (30 meters) short of intersecting the well bore, was delayed several days because of a storm. Once it resumes, the bottom kill operation is expected to take four days.

The huge spill threatened the fish and wildlife-rich Gulf Coast with environmental ruin and plunged residents of coastal communities into months of anguish over their livelihoods and the region's future.

The week after his Florida sojourn, Obama is scheduled for a multi-stop trip around the United States, starting in Wisconsin, where he is to visit factories specializing in renewable energy production and fund-raise for Democrats.

Monday evening will see him in Los Angeles for another fundraising event, before he heads to the northwestern state of Washington on Tuesday for a meeting on health care reform in Seattle, the White House said.

Later this month the First Family is scheduled to vacation in Martha's Vineyard, an elite Massachusetts resort island, in the US northeast.






Saturday, August 7, 2010

Gulf oil well seal holding, BP looks to final kill



BP said yesterday the cement seal on its crippled Gulf of Mexico oil well was holding and a relief well to permanently plug the ill-fated borehole was on track to reach its target in mid-August.

As the final stages of the long-awaited “kill” operation moved forward, nagging questions remained about the lasting environmental and economic impact to the US Gulf region from the world’s worst offshore oil accident.

More than 100 days after the start of the catastrophic spill that ravaged ecologically sensitive wetlands and lucrative coastal economies, BP said no oil was leaking from the undersea Macondo well and no “recoverable oil” was left on the surface of the Gulf of Mexico.







BP finished pumping cement two days ago into the ruptured well one mile below the surface after injections of drilling mud earlier this week subdued the pressure of oil and gas. The wellhead was provisionally capped in mid-July.

The so-called “static kill” at the top of the well is due to be finished off with a “bottom kill” later in August with more mud and cement injected through a relief bore that will be drilled into the well shaft. This relief well is regarded as the final solution to plug the reservoir 13,000 feet beneath the seabed.

BP’s chief operating officer for exploration and production, Doug Suttles, told reporters at a briefing the cement job “appears to be performing as expected.”

“All of the indications so far look very encouraging,” he said in New Orleans. Engineers were pressure-testing the injected cement.

Retired Coast Guard Admiral Thad Allen, who heads the oil spill response for President Barack Obama’s administration, said the relief well was scheduled to reach the well shaft below the seabed “somewhere between August 14th and 15th.”

“We are unequivocally committed to completing the relief wells,” Allen said in a conference call. A second, back-up relief well is also being drilled.

Asked if BP would sell its rights to the Macondo field, Suttles replied: “We just haven’t thought about that.”

“Clearly there is lots of oil and gas here and we will have to think about what to do with that at some point,” he said.

The well’s sealing was a relief for both the British energy giant, whose shares and image have taken a beating from the spill, and for Obama’s administration, which has faced criticism over its response and has pledged to help the pollution-struck Gulf Coast recover.

BP shares, which have recovered strongly since hitting a 14-year low on June 25, appeared once again to be buoyed by the news of the progress in plugging the well. They rose more than 2 per cent in early London trading before falling back to close up 0.46 per cent. In New York, BP shares were up 1.7 per cent in late-day trading.

“FAR FROM FINISHED”

Suttles, who had led BP’s overall oil spill response in the Gulf but was now returning to his chief operating officer role in Houston, nevertheless acknowledged the coastal cleanup effort was “far from finished.”

“Clearly we feel like its moving to a new phase because we’ve been three weeks without new oil flowing into the sea, and we don’t have oil out on the open water anymore. But we still have a lot of work around the shoreline,” he said.

Mike Utsler was appointed to take his place in BP’s Gulf spill response operation.

The company has lost over a third of its market value since the April 20 blast that killed 11 workers, sank the Deepwater Horizon rig and triggered the spill.

Questions remain about the final total of the cleanup bill and the damage liabilities and possible fines BP will face.

“If chapter one of BP’s corporate nightmare took place largely under sea in the battle to plug the leak, the next chapter in this odyssey is likely to play out in courtrooms and law offices,” IHS Energy analyst Andrew Neff wrote in a briefing note.

BP, which already agreed to a US$20 billion (RM62.90 billion) escrow fund to guarantee cover of economic damage claims, has said it would sell about US$30 billion in assets to address the costs related to the spill, and this asset selling process has started.

“More assets are expected to be up for grabs as BP shrinks itself to steel the company for a vastly different future than it envisioned back in April, when the firm was reportedly days away from announcing a massive oil discovery in the Gulf of Mexico,” Neff added.

FEARS OF LONG-TERM IMPACT

Many Gulf Coast residents have seen their fishing and tourism livelihoods devastated by the spill. They and some scientists have expressed skepticism about the government’s assertion this week that around 75 per cent of the estimated 4.9 million barrels of oil leaked by the well had either evaporated, dispersed or otherwise been contained.

Carol Browner, Obama’s energy and climate change adviser, yesterday defended the government declaration.

“No one is trying to oversell or undersell anything,” she told a community forum in St. Petersburg, Florida, where local business owners said even the threat of oil washing ashore had been enough to dent their income. There was no actual oil impact on the St. Petersburg part of the Florida coastline.

BP was working to produce a Gulf Coast recovery masterplan within six months and hoped to get support for it from federal, state and local government, according to James Lee Witt, a former head of the Federal Emergency Management Agency and now a crisis management consultant, who has been contracted by BP.

Michael Hirshfield, chief scientist with the ocean conservation advocacy group Oceana, said it could be years before experts fully understood the spill’s effects on the Gulf of Mexico ecosystem, or on species like the Atlantic bluefin tuna, which spawns in these waters.

“It’s like trying to prove a negative. You have to wait longer for the absence of something,” he said, as the group prepared to embark on a two-month trip to assess long-term impacts on coral, fish, sharks and other marine life.



Tuesday, August 3, 2010

BP readies killer punch for world’s worst oil spill




BP tested equipment today to deliver the first of two planned killer punches to permanently plug its ruptured Gulf of Mexico oil well that caused the world’s worst accidental oil spill.

As engineers from the British-based company ironed out last-minute technical hitches before the initial “static kill” operation, which could take place today, new revised US government figures showed that almost five million barrels of oil leaked before the well was provisionally capped in mid-July.






This made the spill, that began in April following a deadly rig explosion and sinking at the BP-owned deepwater Macondo well, the world’s largest accidental release of oil, surpassing the 1979 Ixtoc well blowout in Mexico’s Bay of Campeche. The Ixtoc well gushed almost three million barrels.

The Macondo spill, already the worst in US history, has unleashed an environmental and economic catastrophe on the US Gulf Coast, disrupting the livelihoods of fishermen and tourism operators and triggering a barrage of damages lawsuits against BP. The company has said it will pay all legitimate claims and clean up fouled beaches and marshes.

The new leak estimates spelled further bad news for BP, which also faces an investigation by US securities regulators into whether its employees profited illegally from the Gulf of Mexico spill. The revised flow numbers suggest the company had underestimated costs by at least US$1 billion (RM3.2 billion).

US regulators are looking into potential insider trading in shares of BP, including by BP employees, two sources familiar with the probe told Reuters yesterday.

BP had estimated the well had leaked some four million barrels of oil and that it would be fined US$1,100 per barrel under the Clean Water Act. The company faces fines of US$4,300 per barrel if gross negligence is proven, but said it saw no need to change its provision as a result of the new estimate.

“Given these new figures, BP could be fined US$4.5 billion if gross negligence is not proven, or up to US$14 billion if it is,” one dealer said.

BP, which took a US$32.2 billion charge related to the spill in its results last week, has said it will sell US$25 billion to US$30 billion of assets to pay for the spill. Kuwait’s oil minister said his state-owned Kuwait Petroleum International may be interested in buying some of the assets.

BP said today it had agreed to sell its Colombian oil unit to a consortium of Canada’s Talisman Energy and Ecopetrol, Colombia’s national oil company, for US$1.9 billion.

BP shares initially fell around 1 per cent in early trading today, but later recovered.

BP’s 10 per cent partner in the well, Japan’s Mitsui, has yet to decide if it will shoulder any costs, helping the trading house to report a 79 per cent jump in profits to 102.5 billion yen (RM3.77 billion).

BP’s other partner in the well, Anadarko Petroleum, which owns a 25 per cent share, is due to report its second quarter results later today.

Hopes for definitively plugging the well are focused on the planned “static kill”, which will inject drilling mud, and possibly later cement, into the top of the well, the first step of a two-pronged operation to seal off the oil deposit.

A crucial test of the equipment that will deliver the “static kill” was delayed yesterday due to a hydraulic leak.

“It is anticipated that the injectivity test and possibly the static kill will take place Tuesday,” BP said in a brief statement late yesterday.

The planned “static kill” will be followed by the completion of a relief well later in August, which will seek to “bottom kill” the well by pumping in more mud and cement.

The Flow Rate Technical Group and a team of government scientists said that of the 4.9 million barrels of oil released by the well, BP had siphoned only about 16 per cent to surface vessels, while the rest went into the sea.

The group’s previous leak estimate ranged from 35,000 to 60,000 barrels a day.

With the peak of the annual hurricane season approaching, authorities are worried that tropical storms could disrupt the well-kill and clean-up operations in the Gulf of Mexico.

Tropical Storm Colin formed in the central Atlantic Ocean early today, but most computer weather models show the system tracking northwest towards Bermuda, and not towards key oil and gas production facilities in the Gulf of Mexico




Monday, August 2, 2010

BP begins 'static kill' operation in bid to finally seal Gulf of Mexico oil well



Photobucket
A boat motors through oil sheen from the Deepwater Horizon spill on Saturday. BP are launching a static kill operation to try and permanently seal the oil well


BP today launched an operation to permanently plug its Gulf of Mexico oil well with cement and mud in a bid to bring to an end the worst spill in U.S. history.

Engineers are set to begin a so-called 'static kill' procedure that will see a stream of mud and cement pumped into the well.

The mile-deep underground reservoir is currently temporarily sealed after a containment cap was placed over the well two weeks ago.





Photobucket
A containment capping stack was placed over the well two weeks ago, temporarily sealing it


It marked the first time BP stopped oil gushing into the Gulf since the leak erupted on April 20 when the Deepwater Horizon oil rig exploded and sank, killing 11 workers.

BP's static kill plans have been designed to enable the well to be fully sealed, providing the clearest path yet for the crews drilling the relief well to ensure oil can never again erupt from the deep-sea well.

As much as 184 million gallons have spewed into the Gulf since the disaster struck.
But there is still uncertainty surrounding its latest efforts.

When the static kill operation begins, crews will pump heavy mud through pipes installed straight down the throat of the well.

If the mud forces the oil back into the underground reservoir and scientists are confident the pressure remains stable, then engineers can pump in fresh cement to seal it.

Officials may then begin the process of choking the underground reservoir feeding the well by pumping mud and then cement down an 18,000ft relief well.

BP officials have said they believe the process is the only way to plug the well for good, by sealing the source of the oil, not just its route to the sea.

'It could be the beginning of the end,' said Darryl Bourgoyne, director of Petroleum Engineering Research Lab at Louisiana State University.

'The only thing that separates the oil from the sea now is the valve. This puts thousands of feet of mud and cement in between,' said Eric Smith, associate director of the Tulane Energy Institute.

'The idea is to have as many barriers as possible between the ocean and the reservoir. We're adding an extra level of safety.'

The whole procedure is still set to be completed by late August despite a brief evacuation for Tropical Storm Bonnie last week.

As the temperature of Gulf of Mexico waters increases, so does the threat of another violent storm disrupting the cleanup process.

Federal officials are hoping to end the oil threat once and for all before peak hurricane season, which typically lasts from mid-August to late October.

'If we can get this thing shut in permanently before the August hurricane season, we will have dodged a huge bullet,' said Rear Adm. Paul Zukunft, the government's on-scene coordinator.

BP has faced fierce criticism in the U.S. over its handling of the affair and last week confirmed the departure of under-fire boss Tony Hayward in October, to be replaced by American chief Bob Dudley.

It also revealed a £20.8billion blow from the spill in second quarter figures and is now threatened with a drilling ban in the Gulf after U.S. politicians passed a bill proposing to freeze the firm out of new drilling leases for seven years.






Sunday, August 1, 2010

BP used excessive dispersants in Gulf oil spill expose toxic in seas.




New documents released by a congressional subcommittee indicate that Coast Guard officials allowed BP to use excessive amounts of chemical dispersants in the Gulf of Mexico.

BP used the chemicals to break up oil after the April 20 Deepwater Horizon rig explosion sent millions of gallons of crude gushing into the Gulf.





Despite a federal directive restricting their use, the Coast Guard routinely granted exemptions, said Rep. Edward J. Markey, chairman of the House Energy and Environment Subcommittee.

In May, the Environmental Protection Agency, along with the Coast Guard, ordered the oil giant to stop surface application of the chemicals during the oil spill except in rare occasions, according to a House subcommittee on energy and environment.

In rare cases, exemptions had to be requested, documents show.

"BP carpet bombed the ocean with these chemicals, and the Coast Guard allowed them to do it," Markey said in a statement Saturday. "After we discovered how toxic these chemicals really are, they had no business being spread across the Gulf in this manner."

The exemptions granted "were in no way rare," Markey said in a letter to retired Adm. Thad Allen, the former commandant of the Coast Guard who is now overseeing the federal response to the oil spill.

The Coast Guard approved more than 74 exemptions in 48 days, Markey said. In one instance, Coast Guard officials allowed the oil giant to use a larger volume of dispersants than it had applied for, he said.

Dispersants are "a toxic stew of chemicals, oil and gas, with impacts that are not well understood," Markey, a Democrat from Massachusetts, said in the letter to Allen.

Markey said the findings are based on an analysis by the Energy and Environment Subcommittee.

Calls to a BP press office and the Joint Information Center were not immediately returned.

"The use of dispersant is always a difficult decision, with environmental trade-offs that must be taken seriously into consideration," EPA spokesman Brendan Gilfillan said Sunday. "As a result, its use in response to the BP spill was subject to numerous strict conditions once it quickly became apparent that BP wanted to use it in unprecedented quantities and in novel ways."

BP's use of disperants peaked at 70,000 gallons on May 24, the EPA said. It was after that the EPA ordered the halt on its use, except for rare occasions. From the time that directive was issued, dispersant use dropped 72 percent, Gilfillan said.

Initially, the EPA was not involved in the day-to-day decisions about which exceptions were granted, but that changed in late June.

"While EPA may not have concurred with every individual waiver granted by the federal on-scene coordinator, the agency believes dispersant use has been an essential tool in mitigating this spill's impact, preventing millions of gallons of oil from doing even more damage to sensitive marshes, wetlands and beaches and the economy of the Gulf coast," Gilfillan said.

Markey said the subcommittee also found contradictions on how much chemical dispersant was being used. On other occasions, BP used more than the amount approved by the Coast Guard, Markey said in his letter.

The report brings into question the total amount of dispersants used in the Gulf. BP says it has used 1.8 million gallons to break up oil flowing from the Deepwater Horizon's ruptured well.

"The validity of those numbers are now in question," Markey said.










Friday, July 23, 2010

Key Ships Leave Oil Spill Site Ahead of Storm-Oil Spill News Investigation and Schwarzenegger on Mel Gibson: He's like the oil leak-DAY 94 Not Seen On TV BP Oil Disaster Government Investigatio












Tropical storm Bonnie forces BP to suspend relief well drilling




Photobucket
BP's efforts to finish relief oil wells in the Gulf of Mexico have been set back.

The approaching tropical storm Bonnie has forced BP to temporarily suspend drilling on its relief well in the Gulf of Mexico. Work to permanently plug the oil giant's leaking Macondo oil well, that has spewed more than 4m barrels of oil into the gulf, could be held up for up two weeks.





In a major setback for BP, ships working on the damaged Macondo oil well are leaving the site due to the storm, which formed over the Bahamas and could reach the spill area by the weekend. They have been ordered to evacuate the area by the US government.

The fleet of 65 ships involved in the disaster response is now leaving, including vessels being used in the monitoring of the well, although some ships may remain on site.

Thad Allen, the official appointed by Barack Obama to lead the federal response to the disaster, said: "Some of the boats may be able to remain on site but we will err on the side of safety.

"While these actions may delay the effort to kill the well for several days, the safety of individuals at the well site is our highest concern."

He warned: "If we have to evacuate the area ... we could be looking at 10 to 14 day gaps in our lines of operation."

BP confirmed this morning that "relief well activities at the well site will be temporarily suspended because of potentially adverse weather associated with tropical storm Bonnie, which is projected to track into the Gulf of Mexico.

"BP will continue to monitor the well as long as weather permits. Duration of the suspension of relief well activities will be dependent on the weather."

Undersea robots that monitor the sealed well will be the last to leave the site and first to return, because they are connected to ships able to handle waves as high as 15 feet, Allen added.

"We are staging our skimming vessels and other assets in a manner that will allow us to promptly restart oil mitigation efforts as soon as the storm passes and we can ensure the safety of our personnel," he said.

The threat of bad weather has already delayed efforts to plug the well at its source deep beneath the sea bed. Engineers were obliged to suspend work on the first of two relief wells that are being drilled down to the source, setting back the final procedure to plug it.

They had been expecting to spend this week reinforcing the last section of the relief well with concrete, which would have allowed an attempt to plug the well with heavy mud over this weekend. Now that will be delayed .

A federal investigation panel in New Orleans continues its exploration of the causes of the disaster which began on 20 April when the Deepwater Horizon oil rig exploded. A widow of one of the 11 workers who died, Natalie Roshto, told the hearing on Thursday that he had been anxious about conditions on the rig before it went up. She said that her husband Shane had called it the oil well "from hell" and told her: "Mother Nature just doesn't want us to drill here."

Meanwhile a Senate committee has called on BP boss Tony Hayward to testify before it on whether the company played any role in the release of Lockerbie bomber Abdelbaset al-Megrahi from prison in Scotland last year. It has been suggested BP lobbied for his release in the hope of securing a lucrative oil deal with Libya.



Thursday, July 22, 2010

BP Photoshops ANOTHER oil spill image: Picture of helicopter flying over sea is removed from website after landing tower is spotted in background... and a bottle of water on the roof



Photobucket
The evidence: Blogger John Arovosis indicates misaligned Photoshopping under his written explanation

Spare a thought for BP's PR department.

As if they weren't already tasked with steering the company and its bungling bosses through the worst oil spill in history, now their job is being sabotaged by trigger-happy picture editors.

For the second time this week, doctored images have appeared on BP's oil leak response website.

Following this latest gaffe, the oil giant has told its post-production crew to 'refrain from doing cutting-and-pasting (sic) in the future'.


Photobucket
Flying low: Strange meter readings

Photobucket

Photobucket
Everything all white? The picture on the left shows a busy BP team at their Houston office. Note the busy graphics projected on the white screen... while on the original image on the right, the screen is blank


Gizmodo blogger Brian Barrett published one of the images, of a helicopter, which he said was sent in to him by a tipster, yesterday.

The picture was entitled 'View of the MC 252 site from the cockpit of a PHI S-92 helicopter 26 June 2010'.

Gizmodo contended however that the helicopter is not in the air at all but on the ground - near a landing tower that has been clumsily left in the shot.

The view of the ocean in the windscreen is a shoddy composite, the blogger claimed, while the pilots themselves are holding pre-flight forms.
Today, the image - which had appeared on its website - was removed and a clarification was posted on the company's Flickr page.

A spokesman for BP said: 'The original and edited images have been posted on the BP Flickr page for comparison.'

To further embarrass the oil giant, a second image has also come to light - this time showing a group of technical staff at a meeting in Houston.

On a wall is a white screen, with busy-looking graphics projected onto it.

However, it turns out they had been edited by 'over-enthusiastic photo library folk' using 'colouring tools' to ensure they could be seen by readers.
It comes just hours after the company was forced to admit that it had in fact doctored another image of its oil spill command centre to make the screen bank staff look busier.

Over the weekend, another eagle-eyed blogger noticed a problem in Houston – and reported that two of the ten screens looked suspiciously like images had been digitally pasted over them.

By Monday, however, the photo on the BP website had changed – now revealing two blank screens in place of the crudely doctored fixes alleged by John Aravosis at Americablog.com.

After further criticism, BP eventually came clean: its photographer had used the computer programme Photoshop to amend his picture.
Spokesman Scott Dean insisted that the photographer was showing off his Photoshop skills and there was no ill intent.

Mr Dean also said BP has ordered its workers to use Photoshop only for things like colour correction, cropping and removing glare.

The embarrassments emerged as a storm brewing in the Caribbean brought the deep-sea effort to plug the ruptured oil well to a near standstill.
The delay came just as BP was getting tantalisingly close to going in for the kill.

Work on the relief well - now just days from completion - was suspended.

Now the cap that has been keeping the oil bottled up since last week may have to be reopened, allowing crude to gush into the sea again for days, said retired Coast Guard Admiral Thad Allen, the government's point man on the crisis.

'This is necessarily going to be a judgment call,' said Allen.

He was waiting to see how the storm developed before deciding whether to order any of the ships and crews stationed some 50 miles out in the Gulf of Mexico to head for safety.

The cluster of thunderstorms passed over Haiti and the Dominican Republic yesterday, and forecasters said the system would probably move into the Gulf over the weekend.

They gave it a 40 per cent chance of becoming a tropical depression or a tropical storm by tomorrow.

Crews had planned to spend Wednesday and Thursday reinforcing with cement the last few feet of the relief tunnel that they hope to use to pump mud into the gusher and kill it once and for all.

But BP put the task on hold and instead placed a temporary plug called a storm packer deep inside the tunnel, in case it has to be abandoned until the storm passes.

If the work crews are evacuated, it could be two weeks before they can resume the effort to kill the well.

That would upset BP's timetable, which called for finishing the relief tunnel by the end of July and plugging the blown-out well by early August.

Scientists have been scrutinising underwater video and pressure data for days, trying to determine if the capped well is holding tight or in danger of rupturing and causing an even bigger disaster. If the storm prevents BP from monitoring the well, the cap may simply be reopened, allowing oil to spill into the water, Allen said.
BP and government scientists were meeting to discuss whether the cap could be monitored from shore.

The relief tunnel extends about two miles under the seabed and is about 50 to 60 feet vertically and four feet horizontally from the ruptured well.

BP plans to insert a final string of casing, or drilling pipe, cement it into place, and give it up to a week to set, before attempting to punch through to the blown-out well and kill it.

In other spill-related news, The New York Times reported early today that Deepwater Horizon rig workers said in a confidential survey before the April 20 explosion that they were concerned about safety and the condition of some equipment on board.

A spokesman for Transocean, the owner of the rig leased by BP, confirmed the existence of the reports to The Associated Press.

Four oil giants - BP was not among them - agreed to pool $1billion to form a new company that would respond to offshore oil spills.

The company would be able to mobilize within 24 hours to capture and contain spills at depths of up to 10,000ft, according to the American Petroleum Institute.

The company's beleaguered CEO, Tony Hayward, was 'invited' to testify before the Senate Foreign Relations Committee next week on BP's role in the release of the Lockerbie bomber.

The company was also forced to deny that he was set to step down after a report in the Times.

BP's broken well spewed somewhere between 94 million and 184 million gallons into the Gulf before the cap was attached.

The crisis - the biggest offshore oil spill in U.S. history - unfolded after the BP-leased Deepwater Horizon rig exploded April 20, killing 11 workers.

Photobucket
Look at that: Window tint anomaly

Photobucket
Shouldering the blame: Is that clumsy cropping

Photobucket
In the air? On the ground? Both? 1. Control tower is visible; 2. Blurring of 'joined seas' and missing part of boat; 3. Badly cropped shoulder; 4. Drink bottle resting on the roof; 5. Misaligned window tint around pilot's glasses; 6. Window reveals floor rather than sea; 7. Altimeter has very low reading; 8. Pre-flight checklist in hand

Photobucket
Looks familiar: The original helicopter picture. Great news for 'spot the difference' fans - but no so good for BP

Photobucket
Tall tales: Pixelation blurs the sea between the two boats, indicative of two images being joined together

Photobucket

Photobucket
Hair today, gone tomorrow: The results of the white screen editing job can be plainly seen as it has a strange effect on the hairlines of two team members


PhotobucketPhotobucket
All change: In the picture on the left, the bottom screen in the middle and another, second from right at the top, appeared doctored.  In the picture on the right, the two previously filled screens are blank after BP put up the undoctored version days later








Click here for more.









Related Posts Plugin for WordPress, Blogger...

My Headlines World News Today

Celebrity Gossip Scandal News

Celebrity Uncensored Leaked Scandal News Photos